The Eurofurence Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

Eurofurence 25 "Fractures in Time" - Estrel Hotel Berlin, August 14-18, 2019Follow eurofurence on Twitter

Pages: [1]   Go Down

Author Topic: Estrel Tower and A100 roadworks information  (Read 1810 times)

ANTIcarrot

  • Regular Member
  • Country: gb
  • Offline Offline
  • Gender: Male
  • Posts: 172
  • Loquacious pawpet show reviewer
    • FA - ANTIcarrot
Estrel Tower and A100 roadworks information
« on: 31.01.2018, 12:29:50 »

Having just gone through the EF booking stampede, I'm sure a lot of other people are looking forwards to when the Estrel Tower and its extra 800 rooms will be finally available. However as many of you are aware, the Estrel can't start on their own construction works until after that big road project is finished, as otherwise there would probably be subsidence issues. That being the case I figured other people might like to know how the A100 is coming along. I recently found this site on the topic, which doesn't really contain new information, but is still very comprehensive and informative about when we can expect to get those extra hotel rooms.

A100 16th Construction Segment (English)
https://translate.googleusercontent.com/translate_c?act=url&depth=1&hl=en&ie=UTF8&prev=_t&rurl=translate.google.com&sl=auto&sp=nmt4&tl=en&u=https://www.berlin.de/senuvk/bauen/strassenbau/a100_16_ba/de/vorhaben.shtml&usg=ALkJrhi6AI1HvNfGwnYKGVTkvxVSdPzAOQ

A100 16. Bauabschnitt (auf Deutsch)
https://www.berlin.de/senuvk/bauen/strassenbau/a100_16_ba/de/vorhaben.shtml

The 16th Segment is being built in several 'lots' and Lot 2 and Lot 3 are the ones next to Estrel's construction site, and are both are described as 'mostly complete'. Unfortunately Lot 1 is going to be a tunnel, which may be heavy enough to have an impact on the Extrel's site, and that's not due for completion until 2020. Though most of the geologically disruptive work should be finished by 2019, at which point Estrel should be given the go ahead to start a site survey to check their plans are still viable. The local district council also recently gave them a preliminary go ahead:
https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.abendblatt-berlin.de%2F2018%2F01%2F06%2Fweg-frei-fuer-estrel-tower%2F&edit-text=&act=url

TLDR; it may not be until EF26 that we see construction work start across the road from us. Assuming Estrel is on the ball and there are no further delays ... We might get to book the extra rooms for EF30, which woudl be a nice anniversary present.

At which point the rooms at Estrel might sell out in a luxurious 70 minutes, rather than the 60 minutes at present.  ::)
« Last Edit: 31.01.2018, 12:37:40 by ANTIcarrot »
Logged

Cheetah

  • Chairman
  • Administrator
  • *
  • Offline Offline
  • Posts: 6300
Re: Estrel Tower and A100 roadworks information
« Reply #1 on: 31.01.2018, 12:56:09 »

Well, there's some good news, too. The district council has approved the change of the development plan for the area (americans know this as a "zoning map"), and thus the building permit has been approved. The main thing holding the project back now is in fact that the main utility access road into the current Autobahn construction site runs right through that plot of land.

(Source: Miranda Meier quoted by the Abendblatt Berlin, January 6th)

The "Tagesspiegel" newspaper also reports: "The renovation of an old Railway underpass at the Sonnenallee had to be cleared, and additionally the A100 Construction Site was blocking the 3 hectar, completely sealed plot of land. The construction site at the Sonnenalle is due to be completed within the year 2018. The planning application is being prepared, and "detailed plans" are being prepared. The Estrel Management did not want to divulge further details at this time."

So it's not the A100 in its entirety that is holding construction back, it's merely just the part at the Sonnenallee.
« Last Edit: 31.01.2018, 13:02:45 by Cheetah »
Logged
yours,

Cheetah

Suicune

  • Regular Member
  • Country: de
  • Offline Offline
  • Gender: Female
  • Posts: 163
  • Rawr!
    • RNG Plays Pokémon
Re: Estrel Tower and A100 roadworks information
« Reply #2 on: 31.01.2018, 15:19:22 »

If more than 10 people would build on the A100, stuff would go way faster. This is the max amount of people I counted - once.
Building the new part shouldn't take that long since Estrel will have an interest in finishing this project as fast as possible. Building a hightower doesn't take that long, at least when they build as efficient as in other countries.

ANTIcarrot

  • Regular Member
  • Country: gb
  • Offline Offline
  • Gender: Male
  • Posts: 172
  • Loquacious pawpet show reviewer
    • FA - ANTIcarrot
Re: Estrel Tower and A100 roadworks information
« Reply #3 on: 31.01.2018, 17:41:48 »

If more than 10 people would build on the A100, stuff would go way faster. This is the max amount of people I counted - once.
Building the new part shouldn't take that long since Estrel will have an interest in finishing this project as fast as possible. Building a hightower doesn't take that long, at least when they build as efficient as in other countries.
Building a tower, no, once they start, but you also have to get contractors and materials ready in a complex logistical operation. The road-contractors can probably give the Estrel contractors an approximate date for when they can start construction - but given real world uncertainties and the costs of a mistake, the Estrel contractors will probably prefer a large margin for error rather than a small one. Which means the lot may sit empty for a few months even after the road contractors are finished with it. More if any blueprints need to be adjusted for any changes in site geology since they last looked 4 years ago.

The published design for the 175m Estrel tower seems similar to the 290m Bank of America Tower, which took 5 years, but with a more complex surface. So 3 years for the tower alone (since some things don't scale with height) once they start construction. Or 4 years if they run into problems with construction or design.

Honestly hope it's sooner than that, especially if they can use the on/off ramps as access once they're completed, but EF28-EF30 would be my best guess.
« Last Edit: 01.02.2018, 13:51:31 by ANTIcarrot »
Logged

James The Dog

  • Regular Member
  • Country: gb
  • Offline Offline
  • Gender: Male
  • Posts: 68
Re: Estrel Tower and A100 roadworks information
« Reply #4 on: 31.01.2018, 21:16:01 »

At which point the rooms at Estrel might sell out in a luxurious 70 minutes, rather than the 60 minutes at present.  ::)

You mean get the reg form filled in in 10 seconds rather than 5  :P Merely being there the second reg opens doesn't mean you'll get a room any more.
Logged

Ragear

  • Regular Member
  • Country: de
  • Offline Offline
  • Gender: Male
  • Posts: 129
  • Ragear the Lion
Re: Estrel Tower and A100 roadworks information
« Reply #5 on: 06.03.2018, 21:19:13 »

and let's not forget when discussing timetables and goals: it's after all Berlin ... :/
Logged

Redblood

  • Regular Member
  • Country: de
  • Offline Offline
  • Posts: 10
Re: Estrel Tower and A100 roadworks information
« Reply #6 on: 20.06.2018, 00:56:47 »

yeah idk how far that projeckt is by now but the comments i read so far now gave me the fear of another unfinished Berlin Airport just that Estrel starts building only then halfway finished getting told nope you can only build so high to get around 200 rooms instead of 800 because of geological trouble or sutch other stuff XD and then taking apart the tower down to said only 200 rooms DX making it a even longer build time  like i said another berlin airport happenening
Logged

Hai

  • Pawpet Show
  • Country: de
  • Offline Offline
  • Gender: Male
  • Posts: 272
  • λ> Just $ "Eyo!" >>= replicate 2
Re: Estrel Tower and A100 roadworks information
« Reply #7 on: 24.06.2018, 17:51:24 »

... what?
Logged
Embedded in the mud, glistening green and gold and black, was a butterfly, very beautiful and very dead.
Twitter | FurAffinity

Cheetah

  • Chairman
  • Administrator
  • *
  • Offline Offline
  • Posts: 6300
Re: Estrel Tower and A100 roadworks information
« Reply #8 on: 25.06.2018, 15:32:10 »

Latest press release on that topic:



(Google translation)


Logged
yours,

Cheetah

ANTIcarrot

  • Regular Member
  • Country: gb
  • Offline Offline
  • Gender: Male
  • Posts: 172
  • Loquacious pawpet show reviewer
    • FA - ANTIcarrot
Re: Estrel Tower and A100 roadworks information
« Reply #9 on: 11.12.2018, 01:05:08 »

This is an old story from 2014, but it seems to contain most of the publicly available pictures and floor plans:
https://www.archdaily.com/482846/barkow-leibinger-win-competition-for-berlin-s-tallest-high-rise?ad_medium=gallery
Logged
Pages: [1]   Go Up