Eurofurence Community > General Discussion

Estrel Tower and A100 roadworks information

<< < (3/3)

ANTIcarrot:
Best Practices of Freedom and Responsibility in Berlin and at the Estrel
01/03/2019

--- Quote ---Beginning back in the early ’90s, he spotted real estate in an underdeveloped section of the Berlin district Neukölln. Recognizing that the city was in need of a sizable hotel and convention facility, he created the Estrel Berlin, which opened in 1994 as Germany’s largest hotel. Since that time, Streletzki has enjoyed the freedom to further expand the property, making it Europe’s largest hotel, congress, and entertainment complex. His creative vision continues with the recently completed, 7.2-million-euro renovation of the Estrel Atrium, as well as the addition of the Estrel Auditorium & Meeting Center in September 2020.  On the horizon for 2023 is the Estrel Tower, which will be Berlin’s tallest residential structure. Home to upward of 1,800 events a year, including such important programs as the Gates Foundation’s Grand Challenges Conference and the World Money Fair Expo, the Estrel Berlin has become Europe’s premier event location and a testimonial to freedom enabling creation.

--- End quote ---
Okay, so we apparently now have three dates:
September 2020 for (part of?) the new convention centre over the road.
End of 2021 for the opening of part of the tower (?)
Some time in 2023 for the completion of the tower (?)

In other news the hotel now has its own tomato garden / Tomatengarten.



[edit:]
And after 5ive long years, they are finally starting the last section of cut&cover tunnel under Neukollnische Strasse, which is the last bit of major civil engineering left at this end of the project, and probably one of the last things standing in the way of the tower project. Similar sections of the A100/16th took one year to complete using the water-cure method.

ANTIcarrot:
October update:
https://www.morgenpost.de/bezirke/neukoelln/article227264689/Estrel-Tower-Wann-Berlins-hoechstes-Haus-gebaut-wird.html

Auf English...
"And now, after a few delays, the date for the start of construction is well set. It should start in the spring of 2020, said Miranda Meier, press spokeswoman for the hotel, the Berliner Morgenpost."

So come Eurofurence 26, we might actually see some construction work across the road from us. Though construction might not be finished until late 2024 or early 2025, so we're still on track for maybe using it for EF30 and very likely using it for EF31.

ANTIcarrot:
RBB 24 now reporting that the Estrel Tower construction has now been confirmed for Autumn of 2020, with construction estimated to finish in 2024
German
English

Jake:
The Internet has news

I found this tweet:
https://twitter.com/CaptainChaotika/status/1448643656215269388

According to the provided photo, the Estrel tower is actually starting to become a real physical thing now.

Here's a link to the Neubau Estrel Tower in Berlin webcam-site.
The site presents a view of the construction site from the top of wing 1 of the Estrel Hotel.

Navigation

[0] Message Index

[*] Previous page

Go to full version